Mitsui Miike SLB300 Roadheader Overhaul

The scope of this overhaul for Thiess/John Holland Airport Link Project in Brisbane is as follows:

  • Full strip down
  • All hydraulic cylinders and valves overhauled. Hydraulic pumps, motors and coolers tested and overhauled as required. All hydraulic hosing and fittings replaced
  • All electric motors tested. Pump motor fully overhauled including fitment of thermal cut-out
  • Apron, chain conveyor and belt conveyor - Duraplate decks replaced, hardfacing and structural repairs and conveyor belt replaced
  • Traction (x2), conveyor (x2), cutter reducer, cutter telescopic (x2), gathering (x2) and belt conveyor gearcases overhauled including bearings and seals and some gears and shafts
  • Traction chains replaced, traction sprockets replaced, traction idlers and take ups overhauled
  • Electrical system tested including current injection on circuit breakers, transformers tested and cabling tested and replaced as required. PLC sent to Japan for testing
  • Pins and bushes - 29 pins (up to 160mm x 560mm) and 44 aluminium bronze bushes, CNC manufactured. Bores built up and line bored as required, bushes freeze fitted.
  • Boom turret bearing imported from Japan and fitted
  • Hand rails, platforms and access ladders repaired or replaced
  • Machine repainted in Mitsui Yellow
  • Full function commissioning including test running of all gearcase with thermography testing